Quantcast
Browsing all 9063 articles
Browse latest View live

Re: Brochure Mobility sap business one Android

Hi John, No, unfortunately the Introduction to SAP Business One mobile app for Android is just available in Brazilian Portuguese | Chinese | English | Japanese | Korean currently (links to...

View Article


Re: CSRF token validation failed

Hi Abhishek Wajge, Thanks for input, we are testing from disable-web-security chrome,we are trying from local network onlyWe are using OData.request () for post method in javascript. Same is working...

View Article


Stop Analysis Office dynamic chart from reformating after "reset data source"

Hello Community, I've come acoss the following issue, which i want to solve - asking you for comments and help: I have created a workbook holding two data sheets.The first provides a table with a...

View Article

Image may be NSFW.
Clik here to view.

Re: How to change Project type in SAP

Hi Praveen, Why CJ07 ? Have you ever seen Project Type field on Project Definition ? You can always see the project type field on WBS Elements (Basic Data Tab). Purpose of CJ07 is to do the changes in...

View Article

Re: Cannot adopt external price in sales return with BAPI

if it is error from the RFC or error from the pricing procedure? It may not be due to  pricing procedure but due to condition type.  If you want to auto populate the manual condition type in return...

View Article


Image to SAP

When I tried to send an image of size 2MB to my SAP Backend it gave me the below error. "SUPPersistenceException: the length of personalization parameters exceeds the limit of authenticate parameters...

View Article

Re: Control of serial numbers in productions (parts and final product serials)

Hi, 1. But how do we control what serial numbers for each part we used to create the final product specific serial? (I use engine #003 and radio #376) to create product with serial #076. And we always...

View Article

give me standard SRM SUS

SUS GurusI need Few clarifications about SRM SUS standard Cyclewe are using SRM 7.01 and Standalone scenario  1.Please give me standard SRM SUS process Steps 2.If the SUS supplier cannot meet all the...

View Article


Re: Connection failed. Could not connect to the SAP HANA Cloud Platform System

I have forwarded this problem to the development teams. They are working on it now. Will update this thread with the outcome. -Bernd

View Article


Re: NWBC-unassigned projects

Hi Maruti, As you are aware, task confirmations can be carried out in 3 ways #Task confimation methodPre-Requisite1Directly in the project structureUser has to have admin authorisation at project...

View Article

Re: Issues in privilege assignment approval in IDM 7.2- SP8

Hello Experts, Any suggestions for the above posted issue? I'm are still facing this issue and looking for any help/suggestions. Thanks & RegardsRashmi

View Article

Re: why we are updateing MIC code for ROH?

If Business want to to do Quality Inspection of the procured material.  MIC need to be maintained in amt master. Please tell us what is your exact req. else its a basic question and Moderator may alert...

View Article

Image may be NSFW.
Clik here to view.

Re: Row level GL accounts in Delivery Order pointing to wrong account

Hi, Sure, this is the relationship map: Ivan

View Article


Image may be NSFW.
Clik here to view.

Re: update Tution Reimbursement wage type

Hi Sophia, You will need to put IF-ENDIF condition in your schema with a new rule (here I am using >UX3 as rule) to check if before certain period it should not process the limit check rule (here I...

View Article

Image may be NSFW.
Clik here to view.

Re: HCI integration with SAP ERP backend system

Hi, try the steps as below image.  , Prasad

View Article


Re: Can i Extend the Field size to right side..

Hi Srinivas, The 'Can Grow' option works vertically not horizontally. It won't overlap onto the fields placed to its right *unless you manually extend the width so that it overlaps other fields beside...

View Article

Re: Where to see value stored in Overtime time type 0040

Hi Sanu Expand the TO02 in the log or under TO02 you have options of 'Input' Processing' and Out put you can look into those nodes and see the whole process. BRUpen

View Article


Re: NWBC-unassigned projects

thanks a lot it for adding vlaue to it...currenlty its getting created directly in NWBC which call T code BP from the backend/ECC

View Article

Re: PROBLEM WITH ALERT PROFILE

Hello Ram, Then you can maintain alert profile, with the button overall profile.Good luck! Regards,SC

View Article

Re: Limit on number of statements exceeded

Hi Volker, Is there any rule to reorganize the tables, that required free space for reorganization? And is it possible to reorganize it partially(means 50% deleted rows to be reorganized) ?  Asad

View Article
Browsing all 9063 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>