hi,
i dont think this will be issue because system will always check for IT0027 before IT0001 and cost will be posted to the CC maintained in IT0027.
Thanks
umakanth
hi,
i dont think this will be issue because system will always check for IT0027 before IT0001 and cost will be posted to the CC maintained in IT0027.
Thanks
umakanth