Nope i cannot open OSS notes. I checked the PM, The call horizon is 100% and complete requirement indicator is checked.....but still not sure how the system releases work order at 178 hour....
Thanks,
Nureya
Nope i cannot open OSS notes. I checked the PM, The call horizon is 100% and complete requirement indicator is checked.....but still not sure how the system releases work order at 178 hour....
Thanks,
Nureya