BPC at least the NW without HANA is not meant to be a real-time application so your actual data will not be directly linked to your source ERP system, a scheduled data load needs to be performed. You could use a BADI that does this but this will ocurr after a data load in BPC, not real time. I am not familiar with APAB but you could ask your basis/ABAP collaborators
↧