Why do you want to use cost center for account assignment A-Asset ?
The cost center is already assigned with Asset in AS02.
Cost center will be automatic triggered via asset. No need to enter cost center manually at the time of PR creation for the account assignment A-Asset (As you are entering Asset number in PR)